Four-stage delivery model
Scope is clarified, details are solved, production is tracked, and site delivery is completed under control.
Review
Design intent, scope, technical risks, material behavior, site dimensions and delivery expectations are clarified.
Develop
Shop drawings, samples, mock-up decisions, junctions, tolerances and fabrication documents are prepared.
Fabricate
Fabrication, QA/QC, labeling, packing and logistics preparation are tracked against approved drawings.
Deliver
Installation sequence, site coordination, punch list, final touch-up and delivery documentation are closed.